Kern Technology successfully finished the project „Grosskraftwerk Mannheim Block 9“


Between 2011-2014 Kern deliver flow measurements, restriction orifices, condensate pots and shut-off valves on different plant manufacturer for the GKM project. Beside the usual measurements we also produce an billing measurement with an length of 9 meter and a weight of about 7 tons. After production process the measurement was transported to scotland for calibration at an high-pressure gas calibration center. Result is an high-end measurement with lowest pressure loss and an accuracy <0,1 %. 

Block 9 is one of the latest and efficient stone coal blocks in the world ! For further information concerning the „Grosskraftwerk Mannheim“ please have a look on www.gkm.de

KERN Technology GmbH & Co. KG  +++  Römerstraße 11  +++  D-67304 Eisenberg  +++  Tel. (+49) 6351 – 49062-0  +++  Fax (+49) 6351 – 49062-22