Kern Technology successfully finished the project „Grosskraftwerk Mannheim Block 9“
Between 2011-2014 Kern deliver flow measurements, restriction orifices, condensate pots and shut-off valves on different plant manufacturer for the GKM project. Beside the usual measurements we also produce an billing measurement with an length of 9 meter and a weight of about 7 tons. After production process the measurement was transported to scotland for calibration at an high-pressure gas calibration center. Result is an high-end measurement with lowest pressure loss and an accuracy <0,1 %.
Block 9 is one of the latest and efficient stone coal blocks in the world ! For further information concerning the „Grosskraftwerk Mannheim“ please have a look on www.gkm.de